Goals

1. Reduce Total Runoff ​​

2. Improve the Landscape

3. Explore the Feasibility of LID

Field Study

Site Introduction

The site of the pilot construction is the office area built in the 1990s. The site's buildings and ground were constructed with a large amount of concrete and little green space. Therefore, the site can be piloted as a small old community.

From the value of area distribution, we can find that the proportion of building area and impervious area is very high (more than 90%) and the proportion of green space is very small (less than 10%), which will lead to the increase of runoff coefficient. Therefore, there is a great necessity and potential for green infrastructure construction in this area

3.png

Area Distribution

4.png

Runoff direction is from north and south to the middle. The red circle is the catchment area

5.png

The pipeline is Municipal Separate Storm Sewer System  (MS4). The optimization space is limited